BAM Clough areas of operation projects

publications

BAM Clough Brochure

( 1.1 MB )

Find out more about BAM Clough

Download Now

Delivering on your Career

( 1.2 MB )

Find out more about a career with BAM Clough.

Download Now

Ichthys Project Onshore LNG Facilities, Product Loading Jetty

( 413 KB )

Design and construct the Ichthys LNG Project Jetty, located at Blaydin Point, Darwin, Northern Territory. The product loading jetty provides two separate berths, one for the LNG carriers and a second for LPG/Condensate carriers.

Download Now

Ichthys Project Onshore LNG Facilities, Module Offloading Facility (MOF)

( 689 KB )

Design and construct a Module Offloading Facility (MOF) comprising a 160 metre x 65 metre heavy lift berth constructed using cellular cofferdams, transition pontoon berth, Module carrier Ro-Ro berths, and breasting and mooring dolphins.

Download Now

Chevron-operated Wheatstone LNG Product Loading Facility (PLF)

( 2.4 MB )

Design and construct a 1.2 kilometre jetty with operations platform, a product loading platform with a single LNG and condensate load out berth and associated piping modules and piping installation as part of the Chevron-operated Wheatstone LNG project

Download Now

PNG LNG Project Marine Jetty

( 1.3 MB )

Design and construct the LNG and condensate offloading jetty for the PNG LNG project

Download Now

Pluto LNG Jetty

( 1.4 MB )

Design and construct 300m approach LNG jetty berth

Download Now

Woodside LNG Jetty - Train V Expansion

( 1.7 MB )

Construction of a second LNG loading berth at Woodside's Karratha onshore gas plant

Download Now

Kaltim Prima Coal Terminal

( 961 KB )

Design, procurement, construction and commissioning of the Kaltim Prima Coal Terminal for PT Kaltim Prima Coal.

Download Now

Woodside Marine Structures Phase II

( 524 KB )

Construction of an 800m LNG and Condensate Load Out Jetty for Woodside

Download Now

Woodside Marine Structures Phase I

( 599 KB )

Construct the Dolphin Berth for Woodside’s North West Shelf including fabrication and installation of 10 large monotube dolphins 800m offshore

Download Now

Port Bonython Wharf

( 579 KB )

Design and construct a liquids terminal and marine structures including a 2400m approach jetty and installation of a submarine pipeline for Santos

Download Now

Cape Lambert Iron Ore Marine Facility

( 991 KB )

Design and construct a service wharf, ore wharf and associated marine facilities for Robe River Iron Associates

Download Now

Barrow Island Oil Field Development

( 221 KB )

Design and construct a service wharf, ore wharf and associated marine facilities for WA Petroleum (WAPET)

Download Now