BAM Clough areas of operation projects

Projects

Port Bonython Liquids Facility

Client:  Santos Limited
Location:  Stony Point, South Australia
Contract Value:  A$45 million (1982)
Scope of Work:  Design and construction of a liquids terminal and marine structures consisting of a 2400 m approach jetty and installation of a 300mm weight coated submarine pipeline. First load out achieved only 1 year after award.

download datasheet



From gallery:



copyright © 2017
BAM Clough